Maintenance tasks of water deferrizating station:
- Water quality check with the mobile testing device.
- Manual and visual diagnostics of station's equipment.
- Disconnection of station's equipment from the pipeline system.
- Full disassembling of the control mechanism into the ingredients.
- Cleaning of control mechanism's disassembled ingredients by cleansing agents.
- Completion of control mechanism using special silicones and greases.
- Adjustment, programming of control mechanism (individually for each customer, according to the parameters of water analysis, specifications of existing equipment and the necessary customer requirements).
- Visual inspection of the filling of filtering tank (sometimes it allows to determine the quality of the filling).
- Loosening of the filling of filtering tank by high pressure air compressor together with countercurrent rinsing in full power.
- Reassembling of all the equipment and connecting it back to the pipeline system.
- Turning the station in working mode (full manual check of station's rinsing cycles, inspection of the strengthenings of wastewater pipelines).
- Acceptance-transfer of the executed maintenance works.
- Consultations on the use of equipment.
- Water sampling and delivery to the laboratory for chemical analysis.